In total 800 tonnes of Japanese knotweed and asbestos were removed through the Dig & Dump method with the job being completed within 5 weeks, and on budget.

Former steelworks, North London - Japanese knotweed infestation

 

Commercial development of residential housing, North London


The site of an old Steelworks needed to be cleared so that it could be used by a commercial development company to build residential housing.

TCM were hired to clear commercial fly-tip materials and asbestos as well as eradicate the Japanese knotweed infestation on the land.

Preparation of the site

We also undertook extensive tree removal and re-engineered a drainage feature before the commencement of these works.

This site had the added complication of a railway on one side and a canal on the other.

800 tonnes removed from location

In total 800 tonnes of Japanese knotweed and asbestos were removed through the Dig & Dump method, completed within 5 weeks and on budget.

We were able to guarantee all work with TCM’s comprehensive insurance backed warranty.